Roadmap

QoreChain Roadmap

QoreChain mainnet is live, launched 7 June 2026. Below is the public roadmap with completed milestones and upcoming targets.

2017–2022

Foundation

3/3 complete
  • Digital asset security platform developmentShipped
  • Core blockchain infrastructure researchShipped
  • Initial protocol architectureShipped
2023–2024

Quantum & AI Pivot

4/4 complete
  • Post-quantum cryptography integration (ML-DSA-87, ML-KEM-1024)Shipped
  • QCAI engine development (smart contract generation + auditing)Shipped
  • Triple-VM architecture (EVM + CosmWasm + SVM)Shipped
  • Cosmos SDK evolution with 47 genesis modulesShipped
2025

Testnet & Tools

5/5 complete
  • Testnet launch (chain ID: qorechain-diana)Shipped
  • Dashboard and explorer release (dashboard.qorechain.io)Shipped
  • QCAI smart contract creator (38 blockchain targets)Shipped
  • QCAI smart contract auditor with PDF reportsShipped
  • Cross-chain bridge architecture (38 direct connections)Shipped
2026

Mainnet year

4/11 complete
  • Mainnet live (chain ID qorechain-vladi), 7 June 2026Shipped
  • Mandatory ML-DSA-87 signatures on the native lane at consensus, no classical fallbackShipped
  • QoreX non-custodial wallet launch (browser extension + mobile), 18 August 2026Shipped
  • Public trading and claim portal, 20 August 2026Shipped
  • Per-lane PQC enforcement parameters (native / EVM / SVM), governance controlledIn progress
  • EVM hybrid post-quantum signatures on mainnet, optional mode, live before January 2027In progress
  • SVM post-quantum key registrationIn progress
  • AMM and lending primitives on mainnetIn progress
  • Connected-chain activation begins: IBC routes first, then first external routes with per-transaction limitsIn progress
  • QoreX: in-wallet staking, buy with card via licensed on-ramp partners, in-wallet swap v1In progress
  • Validator set expansionIn progress
2027

The migration year

  • EVM migration window: public countdown and live migration dashboard (share of hybrid transactions and registered PQ keys)Committed
  • Q3 2027: EVM lane flips to Required. Every EVM transaction needs a valid ML-DSA-87 signature to enter a block. Condition-gated: only after the supermajority of EVM traffic already signs hybridCommitted
  • QoreSign SDK: our hybrid PQ signing pipeline as an open-source SDK (TypeScript, Rust, Swift, Kotlin) so third-party wallets can sign quantum-safe transactionsCommitted
  • Native stablecoin liquidity as the DEX reference pairCommitted
  • SVM migration window toward Required opens (Q4)Committed
  • EU regulatory track: MiCA CASP application prepared and submittedCommitted
  • Cheapest-swap program: weekly automated public benchmark of total swap cost on QoreX vs major DEXsTarget
  • Cross-chain DEX aggregator: any-to-any swaps through QoreChain in one hopTarget
  • QoreX UX 2.0: simple mode, gas abstraction, multi-device recoveryTarget
  • QoreChain Studio enterprise tier, first RDK rollup projectsTarget
  • 12-15 connected routes active, tier-1 exchange expansionTarget
  • Parallel execution upgrade, full governance decentralizationTarget
2028

All three VMs quantum-safe by default

  • H1 2028: SVM lane flips to Required. All three execution environments require post-quantum signatures at consensusCommitted
  • Full activation of the designed bridge topology: every connected chain reaches every other in one hopTarget
  • MiCA CASP authorization (H2), enabling regulated EU services including QoreX Card via a licensed issuing partnerTarget
  • Enterprise production: quantum-safe custody, tokenized securities, trade finance on CosmWasmTarget
  • QCAI model governance on chain with shadow-mode testnet stagingTarget
  • Cryptographic inventory tooling for enterprises preparing their own PQC migrationsExploring
2029

Ahead of the giants

Google and Cloudflare target 2029 for completing their internal post-quantum migrations.

  • PQC-only account mode: accounts can drop classical signatures entirely, by choiceTarget
  • CBDC and institutional settlement pilots on quantum-safe railsTarget
  • Tokenized real-world assets at production scale, T+0 settlementTarget
  • Standards-body contributions (ETSI, ITU-T, IETF) from production PQC-blockchain experienceTarget
  • Validator ecosystem at scale with cross-network licensingTarget
2030

The deadline year

NIST deprecates RSA-2048 and ECC-256 in 2030. The EU expects high-risk critical infrastructure migrated by 2030. That deadline is the environment we have operated in since 2026.

  • PQC-only as the network defaultTarget
  • Quantum-safe interoperability hub for institutions settling between systems mid-migrationTarget
  • Algorithm agility in practice: algorithm transitions through governance, without hard forksExploring

Committed items are engineering commitments with validation gates. Target items depend on ecosystem readiness, audits, or governance votes. Every enforcement change on a live lane is governance-approved and condition-gated: we do not run flag-days on a live chain.