Roadmap
QoreChain Roadmap
QoreChain mainnet is live, launched 7 June 2026. Below is the public roadmap with completed milestones and upcoming targets.
2017–2022
Foundation
3/3 complete- Digital asset security platform developmentShipped
- Core blockchain infrastructure researchShipped
- Initial protocol architectureShipped
2023–2024
Quantum & AI Pivot
4/4 complete- Post-quantum cryptography integration (ML-DSA-87, ML-KEM-1024)Shipped
- QCAI engine development (smart contract generation + auditing)Shipped
- Triple-VM architecture (EVM + CosmWasm + SVM)Shipped
- Cosmos SDK evolution with 47 genesis modulesShipped
2025
Testnet & Tools
5/5 complete- Testnet launch (chain ID: qorechain-diana)Shipped
- Dashboard and explorer release (dashboard.qorechain.io)Shipped
- QCAI smart contract creator (38 blockchain targets)Shipped
- QCAI smart contract auditor with PDF reportsShipped
- Cross-chain bridge architecture (38 direct connections)Shipped
2026
Mainnet year
4/11 complete- Mainnet live (chain ID qorechain-vladi), 7 June 2026Shipped
- Mandatory ML-DSA-87 signatures on the native lane at consensus, no classical fallbackShipped
- QoreX non-custodial wallet launch (browser extension + mobile), 18 August 2026Shipped
- Public trading and claim portal, 20 August 2026Shipped
- Per-lane PQC enforcement parameters (native / EVM / SVM), governance controlledIn progress
- EVM hybrid post-quantum signatures on mainnet, optional mode, live before January 2027In progress
- SVM post-quantum key registrationIn progress
- AMM and lending primitives on mainnetIn progress
- Connected-chain activation begins: IBC routes first, then first external routes with per-transaction limitsIn progress
- QoreX: in-wallet staking, buy with card via licensed on-ramp partners, in-wallet swap v1In progress
- Validator set expansionIn progress
2027
The migration year
- EVM migration window: public countdown and live migration dashboard (share of hybrid transactions and registered PQ keys)Committed
- Q3 2027: EVM lane flips to Required. Every EVM transaction needs a valid ML-DSA-87 signature to enter a block. Condition-gated: only after the supermajority of EVM traffic already signs hybridCommitted
- QoreSign SDK: our hybrid PQ signing pipeline as an open-source SDK (TypeScript, Rust, Swift, Kotlin) so third-party wallets can sign quantum-safe transactionsCommitted
- Native stablecoin liquidity as the DEX reference pairCommitted
- SVM migration window toward Required opens (Q4)Committed
- EU regulatory track: MiCA CASP application prepared and submittedCommitted
- Cheapest-swap program: weekly automated public benchmark of total swap cost on QoreX vs major DEXsTarget
- Cross-chain DEX aggregator: any-to-any swaps through QoreChain in one hopTarget
- QoreX UX 2.0: simple mode, gas abstraction, multi-device recoveryTarget
- QoreChain Studio enterprise tier, first RDK rollup projectsTarget
- 12-15 connected routes active, tier-1 exchange expansionTarget
- Parallel execution upgrade, full governance decentralizationTarget
2028
All three VMs quantum-safe by default
- H1 2028: SVM lane flips to Required. All three execution environments require post-quantum signatures at consensusCommitted
- Full activation of the designed bridge topology: every connected chain reaches every other in one hopTarget
- MiCA CASP authorization (H2), enabling regulated EU services including QoreX Card via a licensed issuing partnerTarget
- Enterprise production: quantum-safe custody, tokenized securities, trade finance on CosmWasmTarget
- QCAI model governance on chain with shadow-mode testnet stagingTarget
- Cryptographic inventory tooling for enterprises preparing their own PQC migrationsExploring
2029
Ahead of the giants
Google and Cloudflare target 2029 for completing their internal post-quantum migrations.
- PQC-only account mode: accounts can drop classical signatures entirely, by choiceTarget
- CBDC and institutional settlement pilots on quantum-safe railsTarget
- Tokenized real-world assets at production scale, T+0 settlementTarget
- Standards-body contributions (ETSI, ITU-T, IETF) from production PQC-blockchain experienceTarget
- Validator ecosystem at scale with cross-network licensingTarget
2030
The deadline year
NIST deprecates RSA-2048 and ECC-256 in 2030. The EU expects high-risk critical infrastructure migrated by 2030. That deadline is the environment we have operated in since 2026.
- PQC-only as the network defaultTarget
- Quantum-safe interoperability hub for institutions settling between systems mid-migrationTarget
- Algorithm agility in practice: algorithm transitions through governance, without hard forksExploring
Committed items are engineering commitments with validation gates. Target items depend on ecosystem readiness, audits, or governance votes. Every enforcement change on a live lane is governance-approved and condition-gated: we do not run flag-days on a live chain.